Design for manufacture of a containerised standby diesel generating set for Lincs offshore wind farm.
Extract from general arrangment drawing of the containerised genset
Extract from clients installation model showing the containerised genset
At Wardpower I designed many different containerised generating sets, including this one for the Lincs offshore wind farm.
Giving an extended run time of 240 hours on full load, the container was horizontally split to house a 13,200 litre fuel tank in the lower compartment. To cope with the extreme offshore conditions I produced novel designs for ingress protection at the openings for air inlet and exhaust gas outlet.
View of diesel genset
View of diesel genset
Installation of the containerised diesel generating set
Lincs offshore wind farm